SL. MWID Description Last Log
1 350 Need to install #IRP1 Chlorine weighting scale controller's Analog Output Card 03rd June 2023 09:51:11 AM
2 351 Installation work of Signal Transmitter at #IRP1 Chlorine Dosing Panel 03rd June 2023 09:56:21 AM
3 352 IRP1 & IRP2 all dtw's RTU,CCTV, VFD panel & instrument cleaning. 03rd June 2023 09:58:19 AM
4 350 Chlorine PLC panel new isolator installation. 03rd June 2023 02:53:24 PM
5 353 Dtw-201,203,208 Optical Fiber restoration. 03rd June 2023 04:05:54 PM
6 354 Laboratory network (internet) problem. Need to check. 04th June 2023 04:10:20 PM
7 355 DTW214 LIT,PIT,FIT isolation for regeneration purpose. 05th June 2023 09:38:52 AM
8 356 DTW-112, 123, 214, 215, 219, 222 LIT Problem. Need to check. 07th June 2023 05:46:11 PM
9 357 DTW-112, 203, 215, 220 PIT Problem. Need to check. 07th June 2023 05:51:11 PM
10 358 Dtw 206 suddenly PIT value not showing.need to check 10th June 2023 08:31:09 AM
11 359 DTW119 FIT problem need to check 11th June 2023 03:37:03 PM
12 360 DTW106 PIT problem need to check. 11th June 2023 03:40:22 PM
13 361 Today after shutdown dtw 116 radio communication fully error. it's happen several times.need to proper check 14th June 2023 09:18:45 PM
14 362 IRP-01 Plant inside 4 no's CCTV view not showing after shutdown...Need to check... 16th June 2023 06:03:52 AM
15 363 Dtw 106 Flow Value not showing. Need to check. 16th June 2023 09:12:28 AM
16 364 Dtw 121 Radio communication error from yesterday. Now the pump locally running. Need to be check. 16th June 2023 09:22:20 AM
17 365 Dtw 213 PIT Problem. Field check, field value is okay. Need to be check. 17th June 2023 01:56:32 PM
18 366 Dtw-205, ACB runs, but when everything is normal after giving control source to PWP panel everything shut down. At present the pump has ACB run. Everything else is kept local. Need to check (Emergency) morning time. 18th June 2023 05:27:01 AM
19 367 Dtw 204 suddenly LIT sensor value not showing.need to check LIT & need to install level interlock bypass option 19th June 2023 09:39:23 PM
20 368 SPD check and installation IRP1 and IRP2 area all DTW. 20th June 2023 08:44:50 AM
21 369 DTW-115 ACB SCADA command not accept. Need to check. 20th June 2023 08:49:02 AM
22 370 DTW-202 Automatically start/stop problem. Need to check.... 20th June 2023 12:36:36 PM
23 371 DTW-221 SCADA Command do not accept. Pump locally running. Need to check. 20th June 2023 01:20:08 PM
24 372 DTW-203, 204, 206, 208 Communication Error. Need to check. 21st June 2023 10:05:50 AM
25 373 Optical Fiber cable isolate from the pole in front of Chairs Bridge . (IRP#1 and IRP#2 Fiber comm. Cable) 21st June 2023 12:54:23 PM
26 374 Dtw 218 RTU panel SPT Problem, Need to be check. 21st June 2023 02:44:36 PM
27 375 Dtw 111 Suddenly FIT Value is showing 30 m3/hr. Field check done. The pump and flow both are in good condition. Need to check FIT. 22nd June 2023 05:14:46 PM
28 376 DTW103 e-PRV flow meter change. 25th June 2023 07:42:52 PM
29 377 DTW117 e-PRV flow meter change. 25th June 2023 07:43:35 PM
30 378 Dtw 116 VFD fault showing.need to check 26th June 2023 05:44:07 AM