1 |
548 |
DTW-214 & 208 Earth Leakage Detector maintenance. |
01st November 2023 08:13:45 AM |
2 |
549 |
DTW-205 optical fiber maintenance. |
01st November 2023 08:15:02 AM |
3 |
550 |
DTW-207 optical fiber maintenance. |
01st November 2023 08:16:07 AM |
4 |
551 |
FIT-3001,3002,2001,4001,4002,4004 signal efficiency check & maintenance planning. |
01st November 2023 08:19:30 AM |
5 |
552 |
IRP-2 SF-D MOV-3V05 fault show. Need to check. |
04th November 2023 04:32:22 PM |
6 |
553 |
Dtw-203 & 121 Radio Comm. Problem check. |
05th November 2023 02:43:46 PM |
7 |
554 |
DTW-103 CCTV optical fiber maintenance. |
06th November 2023 02:25:52 PM |
8 |
555 |
DTW115 radio communication error. Need to check. |
08th November 2023 08:17:39 AM |
9 |
556 |
OS installation to Mr. Zafar Iqbal's computer. |
08th November 2023 08:20:24 AM |
10 |
557 |
DTW104 Automatic pump stop problem check. |
08th November 2023 08:23:27 AM |
11 |
558 |
DTW123 ELD installation and Leakage current check. |
08th November 2023 08:28:18 AM |
12 |
559 |
Dtw-104 Radio Communication error problem. |
13th November 2023 08:20:03 AM |
13 |
560 |
IRP-2 Sludge drying bed pump A and B MC problem check. |
13th November 2023 08:22:33 AM |
14 |
561 |
IRP-2 Sludge Dying Bed pump 3P03A and 3P03B ampere value need to shown in SCADA. |
14th November 2023 08:13:50 AM |
15 |
562 |
DTW-217 flow not showing in SCADA. |
14th November 2023 12:45:27 PM |
16 |
563 |
IRP-2 Inside 4 Nos 360 degree camera maintenance. |
15th November 2023 04:59:00 PM |
17 |
565 |
Dtw 102 Radio communication error. Need to check. Now pump locally running. |
17th November 2023 02:31:19 PM |
18 |
566 |
NAV-3 & NAV-4 Cameras aren't shown in display. |
18th November 2023 08:23:27 AM |
19 |
567 |
Dtw 203 & 208 Flow meter problem. Need to check ICE TEAM. |
19th November 2023 09:37:50 AM |
20 |
568 |
IRP-01
Sand filter MOV-2V07L
MOV Opening and closing time Percent value not showing ... During the Opening period Directly 0 to 100% showing. Need to check... |
20th November 2023 08:24:03 PM |
21 |
570 |
Mr. Sudipto (SAE) computer & printer maintenance work.
1. Windos Setup
2. MS Office Setup
3. Auto CAD software Setup.
4. Printer Setup. |
21st November 2023 04:29:55 PM |
22 |
571 |
IRP-1 Area all DTW CCTV camera check & maintenance. |
22nd November 2023 08:31:59 AM |
23 |
569 |
DTW202 CCTV camera pole base sand filling. |
22nd November 2023 08:33:20 AM |
24 |
572 |
DTW-101 1nos camera problem check & maintenance. |
22nd November 2023 08:56:14 AM |
25 |
573 |
DTW-111 1nos camera problem check & maintenance. |
22nd November 2023 08:57:01 AM |
26 |
574 |
DTW-120 1nos camera problem check & maintenance. |
22nd November 2023 08:58:05 AM |
27 |
575 |
DTW-106 1nos camera problem check & maintenance. |
22nd November 2023 08:59:07 AM |
28 |
576 |
Front Gate 1nos bullet camera problem check & maintenance. |
22nd November 2023 09:00:44 AM |
29 |
577 |
DTW-204 ACB can not close from SCADA. Need to check... |
22nd November 2023 02:49:54 PM |
30 |
578 |
FIT-2001, 3001 Flow summary trend graphic would like to add. As like 4001, 4002, 4004. |
22nd November 2023 08:12:02 PM |
31 |
579 |
OGR Booster pump daily run hour would like to add. As like DTW daily run hour. |
22nd November 2023 08:12:56 PM |
32 |
581 |
DTW Daily flow summary would like to add. |
22nd November 2023 08:16:25 PM |
33 |
583 |
Dtw 114 local network program update to scada pac |
23rd November 2023 09:28:41 AM |
34 |
584 |
DTW-113 LIT,PIT,FIT isolation due to regeneration work. |
23rd November 2023 06:24:44 PM |
35 |
585 |
Dtw-117 e-PRV CRD isn |
25th November 2023 11:48:46 AM |
36 |
586 |
DTW-104 VFD fault & Modbus communication interruption. Need to check. |
25th November 2023 02:28:03 PM |
37 |
587 |
DTW115 GiMAC values isn't shown in SCADA. |
28th November 2023 08:17:09 AM |
38 |
588 |
DTW101 CCTV problem check. |
28th November 2023 08:18:14 AM |
39 |
589 |
DTW121 CCTV problem check. |
28th November 2023 08:19:14 AM |
40 |
590 |
IRP-1 OGR utility pump problem check. |
28th November 2023 08:25:32 AM |
41 |
593 |
Local Pipe Line MOV sealing with Silicon Glue. |
29th November 2023 08:15:47 AM |
42 |
591 |
IRP2 sludge drying bed Pump "A" Sensor problem . Need to check . |
29th November 2023 08:18:27 AM |
43 |
592 |
IRP1 inside CCTV camera near DTW112 need to trim the tree to observed IRP1 Sub-station Power condition. |
29th November 2023 08:21:11 AM |