1 |
321 |
DTW-118 Long time communication erorr |
15th May 2023 04:35:12 PM |
2 |
320 |
Dtw-220 VFD Fault is Showing in Scada. When Dtw-220 is run after shutdown
VFD Fault is coming. After checking the field and pump run, Again fault it. |
15th May 2023 04:35:59 PM |
3 |
318 |
DTW-207 CCTV View not Showing Need to Check. |
15th May 2023 04:37:07 PM |
4 |
317 |
Chlorine weighting scale #2 analog output card need to open for the procurement. |
15th May 2023 04:38:00 PM |
5 |
316 |
IRP-01 Sand filter LIT-2003A and LIT-2003E value fluctuate frequently in
SCADA. Need to check ICE Team. |
15th May 2023 04:38:36 PM |
6 |
314 |
IRP#1 Area DTW CCTV Need TO Clean |
15th May 2023 04:39:18 PM |
7 |
312 |
DTW- 122,123 AND 204 Radio Communication Error. |
15th May 2023 04:39:42 PM |
8 |
311 |
SCADA server room door need to check |
15th May 2023 04:40:07 PM |
9 |
309 |
IRP#02, SDB , A/B LIT problem. Need to check |
16th May 2023 08:46:28 AM |
10 |
307 |
IRP#1 & IRP#2 All DTW LV, PWP and RTU panel ex-haust fan check |
16th May 2023 08:47:11 AM |
11 |
306 |
IRP#1 & IRP#2 All DTW Lightling Arester check. |
16th May 2023 08:47:28 AM |
12 |
305 |
IRP#1 & IRP#2 All DTW Communication system Raising check. |
16th May 2023 08:47:46 AM |
13 |
304 |
DTW-103, 112, 115, 215 GiMac value not showing in SCADA |
16th May 2023 08:48:52 AM |
14 |
302 |
IRP#1 sand filter Rtu panel ex-haust fan (both 2) damaged need to install
immediately |
16th May 2023 08:49:50 AM |
15 |
301 |
IRP-02 Rtu panel ex-haust fan damaged already one year passed. |
16th May 2023 08:51:27 AM |
16 |
300 |
IRP-02 Panel room one ceiling fan not working. Need to check. |
16th May 2023 08:52:06 AM |
17 |
299 |
IRP-02 Panel room AC not working properly. Need to check. |
16th May 2023 08:52:47 AM |
18 |
298 |
DTW-204 PIT value not showing |
16th May 2023 08:53:13 AM |
19 |
295 |
Server Rack(12U) installation at IRP1 DTW area (Total 22 DTWs) |
16th May 2023 08:54:02 AM |
20 |
293 |
Optical fiber integration to DTW for the SCADA network as a primary link |
16th May 2023 08:54:27 AM |
21 |
291 |
Due to rehabilatation work DTW221 LIT and PIT need to open from the
circuit. Also need to reconnect the LIT and PIT after the rehabilitation finish. |
16th May 2023 08:55:37 AM |
22 |
288 |
NAV3 one HDD shown red light. |
16th May 2023 08:56:40 AM |
23 |
281 |
Main Switch (SCADA Server room) to each floor switch dedicated dual
ethernet (Primary+Secondary) cable connection for the smooth internet
experience |
16th May 2023 08:57:52 AM |
24 |
278 |
Following DTW
1. DTW201
2. DTW215
3. DTW102
4. DTW107
5. DTW109
locally Running Need to operate from scada. |
16th May 2023 08:58:32 AM |
25 |
277 |
Training on excel reporting formate at 03.05.2023 (All SO) |
16th May 2023 08:59:08 AM |
26 |
276 |
Due to Dtw-213 Long time communication error, MOV of local network &
Main MOV of Dtw is having problem to open /close at correct time. |
16th May 2023 08:59:39 AM |
27 |
269 |
Following Survillance Camera not functioning:
01. DTW101 -5 nos
02. DTW102 -1 nos
03. DTW106 -5 nos
04. DTW107 -4 nos
05. DTW115 -2 nos
06. DTW117 -4 nos
07. DTW118 -5 nos
08. DTW119 -2 nos
09. DTW120 -4 nos
10. DTW121 -5 nos
11. DTW122 -3 nos
12. DTW123 -3 nos
13. DTW201 -1 nos
14. DTW202 -1 nos
15. DTW203 -5 nos
16. DTW204 -5 nos
17. DTW205 -1 nos
18. DTW206 -4 nos
19. DTW208 -5 nos
20. DTW209 -1 nos
21. DTW210 -2 nos
22. DTW211 -2 nos
23.DTW214 -4 nos
24.DTW222 -1 nos
Main MOV of DTW is having problem to open /close at correct time. |
16th May 2023 09:00:29 AM |
28 |
227 |
DTW 112 PIT problem(value not showing) |
16th May 2023 09:01:16 AM |
29 |
225 |
DTW-109 Radio Communication Problem |
16th May 2023 09:01:56 AM |
30 |
223 |
OGR Distribution pump "B", "D" wring temperature R phase high (101c) need
to check. |
16th May 2023 09:02:28 AM |
31 |
221 |
DTW 103 Scada flow not showing. Need to check
to check. |
16th May 2023 09:03:02 AM |
32 |
219 |
IRP-1 All FIT Calibration |
16th May 2023 09:03:42 AM |
33 |
218 |
DTW-215 VFD Fault is coming (now locally operation) |
16th May 2023 09:04:04 AM |
34 |
236 |
Cctv nav-1, nav-2 and nav-4 view are showing very slowly. Not work as
previous. Follow up and check has both are hamper. Need to be check. |
16th May 2023 09:04:50 AM |
35 |
235 |
IN DTW-117 water enter into the EPRV MOV-1 every section.need to check
previous. Follow up and check has both are hamper. Need to be check |
16th May 2023 09:05:49 AM |
36 |
234 |
DTW 103 PIT problem(value not showing)
previous. Follow up and check has both are hamper. Need to be check |
16th May 2023 09:06:37 AM |
37 |
256 |
DTW213 EPRV flowmeter problem |
16th May 2023 09:07:21 AM |
38 |
262 |
DTW- 201,214 ,122,123 Radio Communication Error |
16th May 2023 09:07:51 AM |
39 |
254 |
ACB Service Hour And Switching Count Need A Report for Preventive
Maintanance |
16th May 2023 09:08:25 AM |
40 |
253 |
VFD Service Hour And Switching Count Need A Report for Preventive
Maintanance. |
16th May 2023 09:09:12 AM |
41 |
252 |
SCADA Room Colour Printer (HP Lolor Laserjetep615n) is Almost Out Of INK
And Need To Maintanance. |
16th May 2023 09:09:42 AM |
42 |
251 |
Laserjet 700 M712 (hp) SCADA Room Black And White Printer is Almost out of
INK |
16th May 2023 09:10:16 AM |
43 |
253 |
FIT Problem List: DTW-103,112 |
16th May 2023 09:11:27 AM |
44 |
252 |
LIT Problem List: DTW-112,123,202 |
16th May 2023 09:12:00 AM |
45 |
251 |
PIT Problem List: DTW-112,204,206,220, |
16th May 2023 09:12:28 AM |
46 |
250 |
(NEW)DTW-116 communication fully error.now it's locally running |
16th May 2023 09:12:52 AM |
47 |
247 |
IRP-2 sand filter 3V09 pipe line field side modification work complete but
scada graphics desing some modificaation remaining |
16th May 2023 09:13:34 AM |
48 |
246 |
IRP-2 CCTV view not showing
scada graphics desing some modificaation remaining |
16th May 2023 09:14:06 AM |
49 |
242 |
E-PRV operation procedure trainning to all scada operator( Field) |
16th May 2023 09:14:36 AM |
50 |
243 |
DTW-208 AND 206 CCTV Footage Is not Showing. ICE TEAM Check But The
Problem Is Not Solved. Need To Check Again. Right Now We Cant See The |
16th May 2023 09:15:15 AM |
51 |
263 |
DTW-208 AND 206 CCTV Footage Is not Showing. ICE TEAM Check But The
Problem Is Not Solved. Need To Check Again. Right Now We Cant See The
View. |
16th May 2023 09:17:19 AM |
52 |
261 |
DTW115, DTW117, DTW118, DTW119 Radio Communication
Problem not solved yet. Need To Check Again. Right Now, We Can't run these pumps from the SCADA. |
16th May 2023 09:18:19 AM |
53 |
260 |
IRP1 and IRP2 sub-station temparature is too much bceause there is no
facilities to control the temparature . Need to install air cooler there as early
as possible before any incident. |
16th May 2023 09:18:53 AM |
54 |
258 |
Chlorine weighing scale #2 is not functioning since the last year |
16th May 2023 09:20:08 AM |
55 |
240 |
DTW-208 CCTV View Is Not Showing. Field Check Problem Not Solved. Need
To Be Checked |
16th May 2023 09:20:46 AM |
56 |
323 |
SCADA operation PC and Dhaka city network PC wireless mouse and keyboard required. |
16th May 2023 06:13:55 PM |
57 |
325 |
Irp-01 Inside 4Nos CCTV not showing.
Need to be check.
|
17th May 2023 05:14:22 PM |
58 |
326 |
Optical fibre torn at DTW214 and DTW121 |
17th May 2023 06:13:18 PM |
59 |
327 |
Optical fibre torn at dtw 121 |
17th May 2023 06:15:09 PM |
60 |
328 |
Irp1 Sludge drying bed pump A LIT Problem. Also the pressure meter has a problem. Need to check LIT |
18th May 2023 07:28:23 PM |
61 |
329 |
CC Camera needed at IRP1 And IRP2 inside Sub- Station. |
18th May 2023 08:33:42 PM |
62 |
310 |
DTW102 regeneration purpose LIT, PIT, FIT connection open and stored properly. |
21st May 2023 11:00:32 AM |
63 |
330 |
DTW223 CCTV(85) Not Power up. |
21st May 2023 04:10:32 PM |
64 |
331 |
IRP-01 plant inside 3 camera not showing... Need to check. |
22nd May 2023 05:29:51 AM |
65 |
332 |
Radio Antenna Need to be shifted From Dtw 109 to to 118 |
22nd May 2023 01:24:39 PM |
66 |
333 |
Internet connectivity at room 205(EXN) |
23rd May 2023 12:52:27 PM |
67 |
334 |
Calibration Of FIT- 2001, 3001 (IRP#02) |
23rd May 2023 01:29:41 PM |
68 |
335 |
Lab Room PC, Printer & Router internet connectivity problem check |
23rd May 2023 04:29:00 PM |
69 |
336 |
LIT, PIT, FIT isolate from the system due to regeneration of DTW215 |
24th May 2023 04:39:04 AM |
70 |
337 |
LIT, PIT, FIT isolate from the system due to rehabilitation of DTW122 |
24th May 2023 04:40:34 AM |
71 |
338 |
IRP1 Substation north corner cc camera view angel modification. Focus at construction site. |
24th May 2023 05:34:24 AM |
72 |
339 |
IRP2 and IRP2 PWP panel thermal sensor functionality check |
24th May 2023 05:35:56 AM |
73 |
340 |
Dtw-214 Locally running for long time because of radio communication error. |
24th May 2023 02:11:23 PM |
74 |
341 |
After Shutdown Plant inside 1 no's CCTV is not showing. |
27th May 2023 06:13:42 AM |
75 |
346 |
DTW202
One CC camera outside casing box were lost. Need to repair. |
27th May 2023 08:44:11 PM |
76 |
342 |
DTW-218, 219, 220, 221, POT Value not showing in SCADA. 203 PIT field and SCADA value not same. Also SCADA PIT valve suddenly goes to high and pump automatically stop.
Need to check. |
28th May 2023 09:57:14 AM |
77 |
343 |
DTW-219, 221 LIT Value not showing in SCADA.Need to check. |
28th May 2023 11:04:16 AM |
78 |
344 |
102, 217, 219, 221 FIT Value not showing in SCADA. Need to check. |
28th May 2023 11:07:15 AM |
79 |
345 |
Drop out fuse connect (DOFC) and disconnect procedure (SOP) will submit by Reazul Islam(E). |
28th May 2023 11:46:59 AM |
80 |
347 |
DTW-221 Automatically start/stop problem. It could be serial communication problem. Need to check. |
29th May 2023 11:55:50 AM |
81 |
348 |
Irp1 and Irp2 Total 25+25 = 50 Cc camera deactivated. Urgently Need to check. |
29th May 2023 06:44:03 PM |
82 |
349 |
Irp2 Has no SCADA system. Need a Scada system at irp2 scada room. |
31st May 2023 04:37:00 PM |